Project Code |
Name of the Project |
Scope of work |
Year |
Client |
Total project amount (US$) |
|||||||||||||||
AH-IQ 17/61 |
Construction of AMAR
health clinic |
Buildings construction (Steel structure ) |
Ongoing 90% COMPLETED |
AMAR |
$2,267,615 |
|||||||||||||||
AH-IQ 17/60 |
Wire fences and gates construction for old well pads Contract
No.: CMIT-PRT-10.53-150157 |
Wire
fences and gates |
2017 |
CNOOC Iraq limited / CMIT |
$787,000 |
|||||||||||||||
AH-IQ 16/59 |
Construction of AMAR School |
Buildings construction (Steel structure ) |
2017 |
AMAR |
$1,500,000 |
|||||||||||||||
AH-IQ 16/58 |
Construction of AL-Khora health clinic |
Buildings construction |
2016 |
AMAR/BP |
749,310 |
|||||||||||||||
AH-IQ 16/57 |
Construction of AL-Khora 1 pipeline with intake pump station |
HDPE Pipeline with water pump
and intake station |
2016 |
AMAR/BP |
720,610 |
|||||||||||||||
AH-IQ 16/56 |
Construction of AL-Nashwa Secondary girl School |
Buildings construction |
2016 |
AMAR/BP |
1,350,000 |
|||||||||||||||
AH-IQ 15/55 |
BUT OVERALL WATER SUPPLY RECONSTRUCTION |
1.Supply and assembly
PVC-U pipes ( 5500m.l). 2. Water filler
installation 3. Valve and valve pit
installation. |
2015 |
CNOOC Iraq limited / CMIT |
220,000 |
|||||||||||||||
AH-IQ 14/54 |
Supplying and Installing
Prefab Caravans for Chkook Camp in Al-Hurriya District- Baghdad Governorate |
Supply in install
prefabricating buildings |
2014 |
UNICEF |
68,000 |
|||||||||||||||
AH-IQ 13/53 |
Staff houses for Missan
University |
Building construction |
2016 |
MOHE |
8,000,000 |
|||||||||||||||
AH-IQ 13/52 |
Electric consumables material for SR degasing stations Sector(OR106329) |
Supply electrical
materials. |
2014 |
ROO |
$258,090 |
|||||||||||||||
AH-IQ 13/51 |
LOT D-1: MARINE CIVIL WORKS |
1. Remove the all existing fenders with chains
and anchor bolts for FIVE berths. 2. Supply
and Install of New Fenders (Type H 1000) for five berths (84 pcs)
Berthfrom 15,16,17,18, and 19 ( SUMITTOMO RUBBER FENDERS-JAPAN) |
2013 |
JICA / GCPI |
$3,257,000 |
|||||||||||||||
AH-IQ 13/50 |
Well Pad Construction-CN100714- OR104670 and OR104738-two
years contract |
Earth work, concrete
works |
2013 |
ROO |
$1,000,000 |
|||||||||||||||
AH-IQ 13/49 |
Ducting &Equipment Bases- PR103363 |
|
2013 |
ROO |
$750,000 |
|||||||||||||||
AH-IQ 13/48 |
CN100964 RSB Checkpoint |
|
2013 |
BP British Petroleum |
$3,099,000 |
|||||||||||||||
AH-IQ 12/47 |
Welding Connection Expansion loop- OR102076- |
|
2012 |
ROO |
$400,000 |
|||||||||||||||
AH-IQ 12/46 |
ROO Warehouse Upgrade Work – Warehouse walls Painting Order
no. : OR101785 |
Painting works for
ROO warehouse. |
2012 |
ROO |
$25,000 |
|||||||||||||||
AH-IQ 12/45 |
Installation ablution unit -OR101545 |
Supply and install
ablution container 12x4m |
2012 |
ROO |
$56,000 |
|||||||||||||||
AH-IQ 12/44 |
Rumaila Supply Base Camp - Perimeter Ditch & Berm, Roads,
Chain Link Fence/ OR102460 |
2000m.l of Ditch and Berm, BRC Fences and roads |
2012 |
BP British Petroleum |
$448,000 |
|||||||||||||||
AH-IQ 12/43 |
LOT D-1: MARINE CIVIL WORKS |
1. Remove the all
existing fenders with chains and anchor bolts for Five berths. |
2012 |
JICA / GCPI |
$4,213,270 |
|||||||||||||||
AH-IQ 12/42 |
Design and construction
sewer networks and main trunk lines at road 40 – BABEL |
1. Design : design drawings , calculations
, preparing shop drawings and GPS drawings were carried out by design team . 2. Pipes Supply :UPVC PIPES :
135500 m,GRP PIPES : 7000 m. 3. Steel Manholes Covers : 2100 rectangular
and circular was supplied . 4. Pipes laying: Gravity Lines: 135500
meter length of UPVC pipes.Main Trunk Lines: 7000 meter length of GRP. 5. House connection: 10000 connections
installed for houses. 6. The ManholesCasting and installation
: 2100 Reinforced concrete Manholes
(about 5680 pieces) –TYPE AS , BS , CS , BD ,CD and CD1 . 7. Earth works (Excavation and
Backfilling). 8. Testing: all system including manholes
and pipes subjected to: Alignment test, Leakage Test, Deflection test,
filtration test and pressure test. 9. Pavement: pave all the trenches |
2012 |
Babel Government |
$38,031,500 |
|||||||||||||||
AH-IQ 11/41 |
ROO Camp - Perimeter Wall and other works -CON-IRAQ-11-0050 |
1. Construct 4000 meter length of perimeter
concrete wall 3 m height 20 cm thick. 2. Supply and install 250 pieces of 4 meter
length T wall barrier , 3. Supply materials and construct 1000 meter
length of BRC Fence with Ditch and berm. 4. Dog Kennel. 5. Duck and shelter. 6. Satellite slabs. 7. Sport area. |
2010 |
BP British Petroleum |
$3,587,000 |
|||||||||||||||
AH-IQ 11/40 |
Upgrade phase Zero- South Rumellabp Camp CON- IRAQ-11-1611 |
|
2011 |
ROO |
$326,495 |
|||||||||||||||
AH-IQ 10/39 |
Supply and install 800kva diesel
generators with cabling works |
1.
Supply and Install 2 units 800kva diesel
generators with all related works. 2.
Cabling works about 1275 meter length
different sizes cables . 3.
Control panels works . 4.
Lighting works . |
2010 |
RTI –Basra |
$349,150 |
|||||||||||||||
AH-IQ 10/38 |
Supply and install storage containers |
Supply and install 10 storage containers |
2010 |
RTI –Basra |
$54,294 |
|||||||||||||||
AH-IQ 10/37 |
Rehabilitation of WES Facilities in 4 schools in Missan
Governorate |
Rehabilitation works for bathrooms for four school |
2010 |
UNICEF |
$54,401 |
|||||||||||||||
AH-IQ 10/36 |
Construction Umm Qaser
oil platform crane |
1.
Design and engineering calculations for
exiting steel oil platform. 2.
Rehabilitation works for existing oil steel
platform with total area 400 meter square . 3.
Supply and install 10 ton capacity , 11
meter length jib crane . 4.
Training |
2010 |
GRS-IRAQI NAVY |
$315,750 |
|||||||||||||||
AH-IQ 10/35 |
Rehabilitation buildings and HESCO Fence at RTI site –Basrah |
1.
Supply and Install HESCO Fences : two layers with total height of 3.72
meter and length of 155 meter were supplied and install , this include
compaction , backfilling with sub-base – QYT : 1100 m3 . 2.
Supply and install coiled razor wire : 155 meter length were installed in the
top of HESCO Fence including V shape post with two gauge wire . 3.
Sewage works : Supply and install 8 inch
PVC Pipes with brick manholes 4.
Sidewalk and cleaning works . |
2010 |
RTI –Basra |
$104,512 |
|||||||||||||||
AH-IQ 09/34 |
Construction AL-Kadraa
Rain and Sanitary Sewer net –Basra |
1. Pipes
laying: a. Gravity Lines: 33000 of UPVC pipes b. Gravity Lines: 1000 m of HDPE . c. Force main: 1500 m of High pressure PVC
Pipes d. House connection: 5000 connection
installed for houses. 2. The Manholes: Casting and istall 560 Reinforced concrete Manholes (about
1680 pieces) –TYPE A&B . 3. Earth works (Excavation and Backfilling): 4. Testing: all system including manholes and pipes
subjected to: Alignment test, Leakage Test, Deflection test, filtration test
and pressure test. 5. Reinforced Concrete for roads : 8520 m3
Supply and construct for road repair 20 cm thick . 6. Pavement: 42600 m2 be paved all the trenches 7. Pump stations ( 4 No. ) : Two Rain and Two Sanitary pump station
the capacity as follow . |
2009 |
Basrah Government |
$6,567,000 |
|||||||||||||||
AH-IQ 09/33 |
Construction of Main sewer Trunk lines in Centre of Basra Project |
1. Pipes
laying: Gravity Lines: 6300 m of UPVC and HDPE 2. The Manholes: Casting and install 90 Reinforced concrete Manholes (about 270
pieces) –TYPE B . 3. Earth works (Excavation and Backfilling). 4. Testing: all system including manholes and pipes
subjected to: Alignment test, Leakage Test, Deflection test, filtration test
and pressure test. 5. Reinforced Concrete for roads : 1490 m3
Supply and construct for road repair 20 cm thick . 6. Pavement: 7450 m2 be paved all the trenches . 7. Ventilation Column : 25 no. were Supply and install |
2009 |
Basrah Government |
$1,668,813 |
|||||||||||||||
AH-IQ 09/32 |
Construction of Talent School |
1.
Classroom and lab.
Building with Furniture : Total area 1000 m2 2. Administrator Building with furniture
Total area : 300 m2 3.
Multi-Purpose Hall
with furniture Total area : 400 m2 4.
Accommodation Building :
with furniture Total area :
400 m2 . 5.
Student bathrooms
with drink cafe with furniture Total area : 100 m2 . 6.
Sport outside area
: Total area : 450 m2 , 7.
Reception with
furniture 8.
Guards room with
one bathroom and furniture 9.
All Building
equipped with 80 no. A/C unit . 10.
All Building
equipped with 20 no. Fire Extinguishers 11.
Water system
including pumping system , 14 water tanks and piping network 12.
Sewage system including two septic tank with 30 brick
manholes and piping network 13.
Electrical System :
including Main 400kva Transformer with columns , cabling works , main and sub
control panels . outside lighting 14.
Roads and sidewalk
: Interlock brick with kirpston Total area 2000 m2 15.
Gardens: Total area
250 m2 |
2009 |
JCCI |
$2,577,914 |
|||||||||||||||
AH-IQ 09/31 |
Design and Construct CCTV System for BasrahInternational Airport |
1.
Supply equipment : 10 number LCD 32' TV ,
PTZ Camera : 34 no. , Fixed camera : 112 no. , DVR :10 NO. with all
accessories and wiring ( Cat06 and RG59 Cables ) , with spare part for one
year , all system Brand : ILAX –Canada . 2. System Installation
: including remove old exiting CCTV System , wiring works , electrical works
, equipment installation and programming 3.
Training : 10 person trained for 14 days . |
2009 |
JCCI |
$396,300 |
|||||||||||||||
AH-IQ 08/30 |
CONSTRUCTION JUMEAT MARKET |
1.
Main Building: Total area 1000 m2 ,
include : 24 different using shops 2.
Big Restaurant . 3.
Out Side area: Total area 7000 m2
Surrounded with Brick wall Fence. 4.
Gardens 5.
Cars Parking 6.
Bathrooms : Eight number 7.
Gardens Store |
2008 |
MM |
$1,001,451 |
|||||||||||||||
AH-IQ 08/29 |
Construction basrah water
network phase I (Saraji , Qibla , AL-Shuhdaa , AL-Baradiyah ) |
1. Materials Supplied: 5000 m pipes of 400 mm PE100 and SDR 17
, 20 Valves with all accessories. 2. Pipes laying: 5000 meter length at 1.2-1.5 m depth of 400 HDPE
. 3. Installation Valves. 4. River Crossing : 5 river 30 m length each one. 5. Earth works 6. Testing: pipes subjected to Hydrostatic test. 7. Road repair: 3000 m2 of
20 mm concrete and 15 mm paving were constructed . 8. Sidewalls repair : of 2000 m2 of sidewalk were reconstruct. 9. Manholes : Constructed 20 Brick Manholes with covers |
2008 |
MM |
$2,197,038 |
|||||||||||||||
AH-IQ 08/28 |
Construction basrah water
network phase II ( Baradiyah-Hakemeyah force main ) |
1.
Materials
Supplied: 3100 pipes of 315 mm HDPE
PE100 and SmDR 17 , 10 Valves with all
accessories. 2.
Pipes
laying: 3100 meter length at 1.2-1.5 m
depth 3.
3. Connection with existing main lines :
Including 900mm and 800mm connections
. 4.
Installation
Valves: installed more than 10 valves with different diameter with boundary
Box 5.
Earth works
(Excavation and Backfilling): 6.
Testing:
pipes subjected to Hydrostatic test. 7.
Road
repair: more than 300 m2 of 20 mm
concrete and 15 mm paving were constructed . 8.
Sidewalls
repair : more than of 500 m2 of sidewalk were reconstruct |
2008 |
MM |
$947,845 |
|||||||||||||||
AH-IQ 07/27 |
Construction of RO-RO berth and repair berth 5 Jetty fenders at
Umm Qaser port |
1.
Preparing
design drawings and calculations for capacity of 250 ton . 2.
Materials
supply : Steel plates from 4mm to 30mm
thickness, total Quantity: 1500 ton. 3.
Steel pipes
from 100mm to 300mm diameter: 5000 meter length. 4.
Steel
piles: 700mm to 1000mm diameter: 3600 meter length. 5.
Rubber
Fenders, Electrometric Bearing, roller and others. 6.
Steel
Section Fabrications : A Bout 2000 meter length of different sizes steel
sections where fabricated. 7.
Construction
RORO and Walkway : including Concrete abutment , Driven Concrete piles
work 200 m length, Driven Steel pipe piles works at shore and offshore : 3600
m length ,Fixed Bridge 33 m length, 10 m width , total weight : 120 ton, Movable Bridge (Ramp) 20 m length , 10 m
width including 3 fixed roller and 3
moving rollers , total weight : 85 ton, Pontoon: 30 m length, 16.5 m width
and 2.5 m height, capacity: 500 ton. , total weight : 400 ton, Ramp extended
on pontoon 25 m length, 10 m width including, total weight: 120 ton. 8.
Rubber
Fender installation. 9.
Installation
of Pipe piles jackets. 10.
Installation
walkway 173 m length , 2 m width |
2007 |
GRS |
$2,734,000 |
|||||||||||||||
AH-IQ 07/26 |
Supply and install Pre-Fabricated metal Caravans to R-Zero Water plant
–Basrah |
Supply and install
Pre-Fabricated metal Caravan |
2007 |
MM (DFID) |
$24,500 |
|||||||||||||||
AH-IQ 06/25 |
Construction of Water Training Centre at R-Zero –Basrah |
1.
Chlorination
laboratory ( Supply from Chemfeed Ltd, Wallace &Tiernan Products - Priory
Works- Tonbridge, Kent- England ). 2.
Coagulation
laboratory (Supply from AL-FAIHA FOR
LABORATORY& SCIENTIFIC SUPPLIES W.L.L- AMMAN – JORDAN) . 3.
Computer
Laboratory (Equipment Supplied from UAE). 4.
Lecture
rooms (Chairs supplied from The Hire Business, Panther Hous , Unit 14
the IO Centre , Lea Road, Waltham Abbey EN9 1AS – England) 5.
Administrator
rooms. 6.
Rest room
&Others . 7.
2. Out Side
area: Total area 1850 m2 Surrounded with BRC Fence and include : 8.
Confined
space laboratory. 9.
Leak
detection area laboratory. 10.
Variable
Depth trench laboratory. 11.
Water Tanks
. 12.
3.
Residential building: Total area 110 m2 13.
Gardens:
Total area 150 m2 14. Caravan for Security men |
2006 |
Mott MacDonald (DFID) |
$560,000 |
|||||||||||||||
AH-IQ 06/24 |
Installation of Phase IV Sewer network at Al-Maqil district , Areas 3 & 4. |
1.
Pipes
laying: Gravity Lines: 24000 m of UPVC pipes 2.
Force main:
4500 meter lengths of DI Pipes from 250mm to 300mm diameter at a depth 1.5 m 3.
House
connection: 3000 connection installed for houses. 4.
The
Manholes: 5.
Casting and
install: 290 Reinforced concrete
Manholes (about 870 pieces). 6.
Earth works
(Excavation and Backfilling): 7.
Testing:
all system including manholes and pipes subjected to: Alignment test, Leakage
Test, Deflection test, filtration test and pressure test. 8.
Pavement:
50000 m2 be paved all the trenches |
2006 |
Fluor AMEC |
$3,135,816 |
|||||||||||||||
AH-IQ 06/23 |
Installation of Phase IV Sewer network at Al-Maqil district , Areas 1 & 2. |
Same above |
2006 |
Fluor AMEC |
$3,532,216 |
|||||||||||||||
AH-IQ 06/22 |
CRITICALINFRASTRUCTURE– BASRAH CONTRACT TWO |
This project located at Basrah in the following locations :
AL-Faw Substation, Bab-ALZubiar Substation, Petrochemical Substation , Umm
Qaser Substation. Main works in this project consist of the following: 1.
Block
Fences with Barbed Wire and Gates:
Total Fence Length 2500 m . 2.
Guard rooms
with its services. 3.
Guard huts
Towers. 4.
Lighting
works. 5.
T concrete
Barrier and others |
2006 |
MM |
$450,036 |
|||||||||||||||
AH-IQ 06/21 |
UN palace protection Fence |
Supply and Install steel fences. |
2006 |
MM |
$111,500 |
|||||||||||||||
AH-IQ 06/20 |
Installation of Pump Station 28 sewer Force main and Nawab
Al-Thubat sewer Trunk line |
1.
Pipes
laying: 140 m of UPVC pipes , 600 mm
diameter 2.
Connection
with existing deep Manholes: 3.
Earth works
(Excavation and Backfilling). 4.
Testing:
pipes subjected to: Alignment test, Leakage Test, Deflection test, filtration
test. The work include also: 1.
Pipes
laying: 800 meter length of DI pipes ,
300 mm. 2.
Connection
with existing deep Manhole( 4.5 m deep) and PS28 3.
Earth works
(Excavation and Backfilling): 4.
materials
used for backfilling . 5.
Air Release
Valves installation with Concrete manholes
. 6.
Testing:
line subjected to Pressure te |
2006 |
Fluor AMEC |
$266,448 |
|||||||||||||||
|
|
||||||||||||||||
GRS : Gulf Region Division -South District
-USACE |
|||||||||||||||||
RTI : International American Consultant
organization |
|||||||||||||||||
JCCI : Joint Contingency Contracting IRAQ |
|||||||||||||||||
JICA: Japan International Cooperation Agency |
|||||||||||||||||
GCPI : General Company of Ports Iraq |
|||||||||||||||||
ROO: Rumaila Operating Organization MM: Mott MacDonald MOHE : Ministry Of Higher Education Legend
|