Previous Experience
Works Done by Our Branch in Iraq
The following list of projects done by our branch in Iraq:

 

Project Code

Name of the Project

Scope of work

Year

Client

Total project amount (US$)

AH-IQ

17/61

Construction of AMAR  health clinic

Buildings construction

 (Steel structure )

Ongoing

90% COMPLETED

AMAR

$2,267,615

AH-IQ

17/60

Wire fences and gates construction for old well pads Contract No.: CMIT-PRT-10.53-150157

Wire fences and gates

2017

CNOOC Iraq limited / CMIT

$787,000

AH-IQ

16/59

Construction of AMAR School

Buildings construction

 (Steel structure )

2017

AMAR

$1,500,000

AH-IQ

16/58

Construction of AL-Khora health clinic

Buildings construction

2016

AMAR/BP

749,310

AH-IQ

16/57

Construction of AL-Khora 1 pipeline with intake pump station

HDPE Pipeline with water pump and intake station

2016

AMAR/BP

720,610

AH-IQ

16/56

Construction of AL-Nashwa Secondary girl School

Buildings construction

2016

AMAR/BP

1,350,000

AH-IQ

15/55

BUT OVERALL WATER SUPPLY RECONSTRUCTION

1.Supply and assembly PVC-U pipes ( 5500m.l).

2. Water filler installation

3. Valve and valve pit installation.

2015

CNOOC Iraq limited / CMIT

220,000

AH-IQ

14/54

Supplying and Installing Prefab Caravans for Chkook Camp in Al-Hurriya District- Baghdad

Governorate

Supply in install prefabricating buildings

2014

UNICEF

68,000

AH-IQ

13/53

Staff  houses for Missan University

Building construction

2016

MOHE

8,000,000

AH-IQ

13/52

Electric consumables material for SR degasing stations

Sector(OR106329)

Supply electrical materials.

2014

ROO

$258,090

AH-IQ

13/51

LOT D-1: MARINE CIVIL WORKS
AT UMM QASR PORT-Amendment no.1

1.    Remove the all existing fenders with chains and anchor bolts for FIVE berths.

2.    Supply  and Install of New Fenders (Type H 1000) for five berths (84 pcs) Berthfrom 15,16,17,18, and 19 ( SUMITTOMO RUBBER FENDERS-JAPAN)

2013

JICA / GCPI

$3,257,000

AH-IQ 13/50

Well Pad Construction-CN100714- OR104670 and OR104738-two years contract

Earth work, concrete works

2013

ROO

$1,000,000

AH-IQ

13/49

Ducting &Equipment Bases- PR103363

1.    UPVC Ducts

2.    Draw Pits

3.    Road Crossings

4.    Equipment Bases

2013

ROO

$750,000

AH-IQ

13/48

CN100964  RSB Checkpoint

1. Earth works

2. T-walls & barriers

3. Roads

4. Mep - foul system

5. Mep - elv duct network

6. Over head shading8m high(38mx52m);

7. Steel search steps

8. Concrete works;

9. Supply and install 6m steel gate with 3m

10. Steel gate 1.5m width and 3m height

2013

BP British Petroleum

$3,099,000

AH-IQ

12/47

Welding Connection Expansion loop- OR102076-

1.    Welding:-

2.    P/l 10”   dia nominal bore weld

3.    Main road crossing

4.    P/l 10”  dia nominal bore  crossing

5.    Piping crossing

6.    Sliding and fixed concrete supports

7.    Sliding support of the pipe

8.    size (10 "x0.365 gr.b).

9.    Fixed support of the pipe size  (10 "x0.365 gr.b).

10. Guide support of the pipe size  (10 "x0.365 gr.b).

11. High fixed support of the pipe size (10 "x0.365 gr.b).

12. Hydrostatic test

13. Radio graphic test

14. Sand blast and painting

15. Structural works (concrete work )

2012

ROO

$400,000

AH-IQ

12/46

ROO Warehouse Upgrade Work – Warehouse walls Painting  Order  no. : OR101785

Painting works for ROO warehouse.

2012

ROO

$25,000

AH-IQ

12/45

Installation ablution unit -OR101545

Supply and install ablution container 12x4m

2012

ROO

$56,000

AH-IQ

12/44

Rumaila Supply Base Camp - Perimeter Ditch & Berm, Roads, Chain Link Fence/ OR102460

2000m.l of  Ditch and Berm, BRC Fences and roads

2012

BP British

Petroleum

$448,000

AH-IQ

12/43

LOT D-1: MARINE CIVIL WORKS
AT UMM QASR PORT

1. Remove the all existing fenders with chains and anchor bolts for Five berths.
2. Provide and Install of New Fenders (Type H 1000) for five berths (80 pcs) Berth from 12,13,14 ,20,21.( SUMITTOMO RUBBER FENDERS-JAPAN)
3. Repair of Concrete Slab Decks (Bottom)
4. Repair of Concrete Cracks (Bottom).

2012

JICA / GCPI

$4,213,270

AH-IQ

12/42

Design and construction  sewer networks and main trunk lines at road 40 – BABEL

1.      Design : design drawings , calculations , preparing shop drawings and GPS drawings were carried out by design team .

2.      Pipes Supply  :UPVC PIPES : 135500 m,GRP PIPES : 7000 m.

3.      Steel Manholes Covers : 2100 rectangular and circular was supplied .

4.      Pipes laying: Gravity Lines: 135500 meter length of UPVC pipes.Main Trunk Lines: 7000 meter length of GRP.

5.      House connection: 10000 connections installed for houses.

6.      The ManholesCasting and installation :  2100 Reinforced concrete Manholes (about 5680 pieces) –TYPE AS , BS , CS , BD ,CD and CD1 .

7.      Earth works (Excavation and Backfilling).

8.      Testing: all system including manholes and pipes subjected to: Alignment test, Leakage Test, Deflection test, filtration test and pressure test.

9.      Pavement: pave all the trenches

2012

Babel Government

$38,031,500

AH-IQ

11/41

ROO Camp - Perimeter Wall and other works -CON-IRAQ-11-0050

1.    Construct 4000 meter length of perimeter concrete wall 3 m height 20 cm thick.

2.    Supply and install 250 pieces of 4 meter length T wall barrier ,

3.    Supply materials and construct 1000 meter length of BRC Fence with Ditch and berm.

4.    Dog Kennel.

5.    Duck and shelter.

6.    Satellite slabs.

7.    Sport area.

2010

BP British Petroleum

$3,587,000

AH-IQ

11/40

Upgrade phase Zero- South Rumellabp Camp CON- IRAQ-11-1611

General site rehabilitation works that include but not limited to  :

1.  Transfer one unit of Watch tower from phase zero to south side of parameter wall

2.  Landscaping

3.  Supply and install cast iron manhole covers 80cmx80cm

4.  Supply and install  galvanized chain link fence 2.40 m height,

5.  Construct concrete bund& base for the fuel tanks in phase zero

6.  Diesel tank delivery point of phase zero

7.  Supply and install adjustable wall mounted bracket for the T.Vs

8.  Construct concrete steps

9.  Site preparation, to include removing the gravels, compact the area for the concrete plinths, casting C10 blinding concrete of 100mm thick

10.             Dig a trench of 1200mm deep 600mm wide for installing the chiller pipes

11.             Supply and Install a feeder Pillar

2011

ROO

$326,495

AH-IQ

10/39

Supply and install 800kva diesel  generators with cabling works

1.      Supply and Install 2 units 800kva diesel generators with all related works.

2.      Cabling works about 1275 meter length different sizes cables .

3.      Control panels works .

4.      Lighting works .

2010

RTI –Basra

$349,150

AH-IQ

10/38

Supply and install storage containers

Supply and install 10 storage containers

2010

RTI –Basra

$54,294

AH-IQ

10/37

Rehabilitation of WES Facilities in 4 schools in Missan Governorate

Rehabilitation works for bathrooms  for four school

2010

UNICEF

$54,401

AH-IQ

10/36

Construction Umm Qaser  oil platform crane

1.      Design and engineering calculations for exiting steel oil platform.

2.      Rehabilitation works for existing oil steel platform with total area 400 meter square .

3.      Supply and install 10 ton capacity , 11 meter length jib crane .

4.      Training

2010

GRS-IRAQI NAVY

$315,750

AH-IQ

10/35

Rehabilitation buildings and HESCO Fence at RTI site –Basrah

1.      Supply and Install HESCO Fences  : two layers with total height of 3.72 meter and length of 155 meter were supplied and install , this include compaction , backfilling with sub-base – QYT : 1100 m3 .

2.      Supply and install coiled razor wire  : 155 meter length were installed in the top of HESCO Fence including V shape post with two gauge wire .

3.      Sewage works : Supply and install 8 inch PVC Pipes with brick manholes

4.      Sidewalk and cleaning works .

2010

RTI –Basra

$104,512

AH-IQ

09/34

Construction AL-Kadraa  Rain and Sanitary Sewer net –Basra

1.  Pipes laying:

a.      Gravity Lines: 33000 of UPVC pipes

b.      Gravity Lines: 1000 m of HDPE .

c.      Force main: 1500 m of High pressure PVC Pipes

d.      House connection: 5000 connection installed for houses.

2. The Manholes: Casting and istall  560 Reinforced concrete Manholes (about 1680 pieces) –TYPE A&B .

3. Earth works (Excavation and Backfilling):

4. Testing: all system including manholes and pipes subjected to: Alignment test, Leakage Test, Deflection test, filtration test and pressure test.

5. Reinforced Concrete for roads : 8520 m3 Supply and construct for road repair 20 cm thick .

6. Pavement: 42600 m2  be paved all the trenches

7. Pump stations ( 4 No. )  : Two Rain and Two Sanitary pump station the capacity as follow .

2009

Basrah Government

$6,567,000

AH-IQ

09/33

Construction of Main sewer Trunk lines in Centre of Basra  Project

1.  Pipes laying: Gravity Lines: 6300 m of UPVC and HDPE

2. The Manholes: Casting and install  90 Reinforced concrete Manholes (about 270 pieces) –TYPE B .

3. Earth works (Excavation and Backfilling).

4. Testing: all system including manholes and pipes subjected to: Alignment test, Leakage Test, Deflection test, filtration test and pressure test.

5. Reinforced Concrete for roads : 1490 m3 Supply and construct for road repair 20 cm thick .

6. Pavement: 7450 m2  be paved all the trenches .

7. Ventilation Column : 25 no. were Supply and install

2009

Basrah Government

$1,668,813

AH-IQ

09/32

Construction of Talent School

1.      Classroom and lab. Building with Furniture : Total area 1000 m2

2.      Administrator Building with furniture  Total area : 300  m2

3.      Multi-Purpose Hall with furniture  Total area : 400  m2

4.      Accommodation  Building :  with furniture  Total area : 400  m2 .

5.      Student bathrooms with drink cafe with furniture Total area : 100  m2 .

6.      Sport outside area :  Total area : 450 m2  ,

7.      Reception with furniture

8.      Guards room with one bathroom and furniture

9.      All Building equipped with 80 no. A/C unit .

10.   All Building equipped with 20 no. Fire Extinguishers

11.   Water system including pumping system , 14 water tanks and piping network

12.   Sewage system  including two septic tank with 30 brick manholes and piping network

13.   Electrical System : including Main 400kva Transformer with columns , cabling works , main and sub control panels  . outside lighting

14.   Roads and sidewalk :  Interlock brick with kirpston  Total area 2000 m2

15.   Gardens: Total area 250 m2

2009

JCCI

$2,577,914

AH-IQ

09/31

Design and Construct CCTV System for BasrahInternational Airport

1.      Supply equipment : 10 number LCD 32' TV , PTZ Camera : 34 no. , Fixed camera : 112 no. , DVR :10 NO. with all accessories and wiring ( Cat06 and RG59 Cables ) , with spare part for one year , all system Brand : ILAX –Canada .

2.      System Installation : including remove old exiting CCTV System , wiring works , electrical works , equipment installation and programming

3.      Training : 10 person trained for 14 days .

2009

JCCI

$396,300

AH-IQ

08/30

CONSTRUCTION JUMEAT MARKET

1.      Main Building: Total area 1000 m2  ,  include : 24 different using shops

2.      Big Restaurant .

3.      Out Side area: Total area 7000 m2 Surrounded with Brick wall Fence.

4.      Gardens

5.      Cars Parking

6.      Bathrooms : Eight number

7.      Gardens Store

2008

MM

$1,001,451

AH-IQ

08/29

Construction basrah  water network phase I (Saraji , Qibla , AL-Shuhdaa , AL-Baradiyah )

1.      Materials Supplied: 5000 m pipes of 400 mm PE100 and SDR 17 ,  20 Valves with all accessories.

2.      Pipes laying:  5000  meter length at 1.2-1.5 m depth of 400 HDPE .

3.      Installation Valves.

4.      River Crossing : 5 river 30 m length each one.

5.      Earth works

6.      Testing: pipes subjected to Hydrostatic test.

7.      Road repair: 3000 m2  of 20 mm concrete and 15 mm paving were constructed .

8.      Sidewalls repair : of 2000 m2 of sidewalk were reconstruct.

9.      Manholes : Constructed 20 Brick Manholes with covers

2008

MM

$2,197,038

AH-IQ

08/28

Construction basrah  water network phase II ( Baradiyah-Hakemeyah force main )

1.      Materials Supplied: 3100  pipes of 315 mm HDPE PE100 and SmDR 17 ,  10 Valves with all accessories.

2.      Pipes laying:  3100 meter length at 1.2-1.5 m depth

3.      3.  Connection with existing main lines : Including 900mm and 800mm connections  .

4.      Installation Valves: installed more than 10 valves with different diameter with boundary Box

5.      Earth works (Excavation and Backfilling):

6.      Testing: pipes subjected to Hydrostatic test.

7.      Road repair: more than 300 m2  of 20 mm concrete and 15 mm paving were constructed .

8.      Sidewalls repair : more than of 500 m2 of sidewalk were reconstruct

2008

MM

$947,845

AH-IQ

07/27

Construction of RO-RO berth and repair berth 5 Jetty fenders at Umm Qaser port

1.      Preparing design drawings and calculations for capacity of 250 ton .

2.      Materials supply :  Steel plates from 4mm to 30mm thickness, total Quantity: 1500 ton.

3.      Steel pipes from 100mm to 300mm diameter: 5000 meter length.

4.      Steel piles: 700mm to 1000mm diameter: 3600 meter length.

5.      Rubber Fenders, Electrometric Bearing, roller and others.

6.      Steel Section Fabrications : A Bout 2000 meter length of different sizes steel sections where fabricated.

7.      Construction RORO and Walkway  : including  Concrete abutment , Driven Concrete piles work 200 m length, Driven Steel pipe piles works at shore and offshore : 3600 m length ,Fixed Bridge 33 m length, 10 m width , total weight : 120 ton,  Movable Bridge (Ramp) 20 m length , 10 m width including  3 fixed roller and 3 moving rollers , total weight : 85 ton, Pontoon: 30 m length, 16.5 m width and 2.5 m height, capacity: 500 ton. , total weight : 400 ton, Ramp extended on pontoon 25 m length, 10 m width including, total weight: 120 ton.

8.      Rubber Fender installation.

9.      Installation of Pipe piles jackets.

10.   Installation walkway 173 m length , 2 m width

2007

GRS

$2,734,000

AH-IQ

07/26

Supply and install Pre-Fabricated  metal Caravans to R-Zero Water plant –Basrah

Supply and install Pre-Fabricated  metal Caravan

2007

MM

(DFID)

$24,500

AH-IQ

06/25

Construction of Water Training Centre  at R-Zero –Basrah

1.      Chlorination laboratory ( Supply from Chemfeed Ltd, Wallace &Tiernan Products - Priory Works- Tonbridge, Kent- England ).

2.      Coagulation laboratory (Supply from  AL-FAIHA FOR LABORATORY& SCIENTIFIC SUPPLIES W.L.L- AMMAN – JORDAN) .

3.      Computer Laboratory (Equipment Supplied from UAE).

4.      Lecture rooms (Chairs supplied from The Hire Business, Panther Hous , Unit 14 the IO Centre , Lea Road, Waltham Abbey EN9 1AS – England)

5.      Administrator rooms.

6.      Rest room &Others .

7.      2. Out Side area: Total area 1850 m2 Surrounded with BRC Fence and  include :

8.      Confined space laboratory.

9.      Leak detection area laboratory.

10.   Variable Depth trench laboratory.

11.   Water Tanks .

12.   3. Residential building: Total area 110 m2

13.   Gardens: Total area 150 m2

14.   Caravan for Security men

2006

Mott

MacDonald (DFID)

$560,000

AH-IQ

06/24

Installation of Phase IV Sewer network at  Al-Maqil district , Areas 3 & 4.

1.      Pipes laying: Gravity Lines: 24000 m of UPVC pipes

2.      Force main: 4500 meter lengths of DI Pipes from 250mm to 300mm diameter at a depth 1.5 m

3.      House connection: 3000 connection installed for houses.

4.      The Manholes:

5.      Casting and install:  290 Reinforced concrete Manholes (about 870 pieces).

6.      Earth works (Excavation and Backfilling):

7.      Testing: all system including manholes and pipes subjected to: Alignment test, Leakage Test, Deflection test, filtration test and pressure test.

8.      Pavement: 50000 m2  be paved all the trenches

2006

Fluor AMEC

$3,135,816

AH-IQ

06/23

Installation of Phase IV Sewer network at  Al-Maqil district , Areas 1 & 2.

Same above

2006

Fluor AMEC

$3,532,216

AH-IQ

06/22

CRITICALINFRASTRUCTURE– BASRAH CONTRACT TWO

This project located at Basrah in the following locations : AL-Faw Substation, Bab-ALZubiar Substation, Petrochemical Substation , Umm Qaser Substation. Main works in this project consist of the following:

1.      Block Fences with Barbed Wire and Gates:  Total Fence Length 2500 m  .

2.      Guard rooms with its services.

3.      Guard huts Towers.

4.      Lighting works.

5.      T concrete Barrier and others

2006

MM

$450,036

AH-IQ

06/21

UN palace protection Fence

Supply and Install steel fences.

2006

MM

$111,500

AH-IQ

06/20

Installation of Pump Station 28 sewer Force main and Nawab Al-Thubat sewer Trunk line

1.      Pipes laying:  140 m of UPVC pipes , 600 mm diameter

2.      Connection with existing deep Manholes:

3.      Earth works (Excavation and Backfilling).

4.      Testing: pipes subjected to: Alignment test, Leakage Test, Deflection test, filtration test.

 

The work include also:

 

1.      Pipes laying:  800 meter length of DI pipes , 300 mm.

2.      Connection with existing deep Manhole( 4.5 m deep) and PS28

3.      Earth works (Excavation and Backfilling):

4.      materials used for backfilling .

5.      Air Release Valves installation with Concrete manholes  .

6.      Testing: line subjected to Pressure te

2006

Fluor AMEC

$266,448


 

 

 

 

 

 

 

 

Abbreviation

GRS : Gulf Region Division -South District -USACE

RTI : International American Consultant organization

JCCI : Joint Contingency Contracting IRAQ

JICA: Japan International Cooperation Agency

GCPI : General Company of Ports Iraq

ROO: Rumaila Operating Organization

MM: Mott MacDonald

MOHE : Ministry Of Higher Education

 

Legend

 

 

 

UNDER CONSTRUCTION PROJECTS

 

 

CIVIL WORKS

 

 

MARINE WORKS

 

 

SEWAGE WORKS

 

 

ELECTRICAL WORKS

 

 

WATER WORKS