Previous experiences
More 250 projects were performed in different fields, these works completed with a highest quality
and under schedule time in the following areas:
Marine Works
AH is a leader company in IRAQ in the area of marine works that including onshore and offshore
works. Recently, AH completed 7,000,000 USD LOT-D1 project at Umm Qaser port. This project
include: remove the all existing fenders with chains and anchor bolts for ten berths, supply and
Install of new Fenders (Type H1000-Sumittomo/Japan) for ten berths (164 pcs) Berth from 12 to
21, the work include Repair of Concrete Slab Decks and Cracks (Bottom). In 2007, the first large
ship discharged at new RORO berth at Umm port that designed and constructed by AH, this
project include offshore works like concrete piles and concrete abutment, while the onshore works
include 800mm steel pipe piles ( about 3000m), 270m walk way, fenders works, pontoon works,
and many others.
Al-Hilu Group
of Companies
Working for Better Engineering Future
Previous Experience
Previous experiences
More 250 projects were performed in different fields, these works completed with a highest quality
and under schedule time in the following areas:
To see list of projects done by Al-Hilu Group choose one of the following links:
Iraq Projects List
UAE Projects List
To watch thanks letter that our company acquired from our clients
press here
|